Skip to main content

Sign up for free

  • Get quick access to your favorite articles

  • Manage alerts on breaking news and favorite drivers

  • Make your voice heard with article commenting.

Recommended for you

Indy 500 Day 2 practice results: Conor Daly tops the charts at 228mph

IndyCar
Indianapolis Road Course
Indy 500 Day 2 practice results: Conor Daly tops the charts at 228mph

Alex Palou: “I love that we’re getting some heat” after hearing boos

IndyCar
110th Running of the Indianapolis 500
Alex Palou: “I love that we’re getting some heat” after hearing boos

Katherine Legge focused on results, not milestones in Indy-Charlotte Double

IndyCar
110th Running of the Indianapolis 500
Katherine Legge focused on results, not milestones in Indy-Charlotte Double

How Max Verstappen pulls the strings for his GT3 team even on F1 weekends

NLS
How Max Verstappen pulls the strings for his GT3 team even on F1 weekends

The exclusive club Katherine Legge hopes to join with historic 'Double' attempt

IndyCar
Indianapolis Road Course
The exclusive club Katherine Legge hopes to join with historic 'Double' attempt

Joan Mir interview: Crashes, Honda and his future in MotoGP

MotoGP
French GP
Joan Mir interview: Crashes, Honda and his future in MotoGP

Kimi Antonelli earns praise from former F1 driver after Miami GP battle with Lando Norris

Formula 1
Miami GP
Kimi Antonelli earns praise from former F1 driver after Miami GP battle with Lando Norris

Why Aprilia’s MotoGP surge is no accident

MotoGP
French GP
Why Aprilia’s MotoGP surge is no accident

All F1 teams meet 2024 cost cap as Aston Martin accepts "procedural breach"

The FIA has confirmed its Formula 1 2024 Cost Cap Administration findings

Lance Stroll, Aston Martin Racing

All 10 Formula 1 teams successfully obliged with the championship cost cap during the 2024 season with only Aston Martin found to be in a “procedural breach”, the FIA has confirmed. 

F1 introduced a cost cap in 2021 to try and create a more level playing field between the top and bottom teams, as frontrunning outfits had significantly larger budgets than backmarkers. 

The cap started at $145million and has since been reduced to $135m for 2025. A seven-month investigation has led to the FIA confirming today (28 October) which teams met the requirements for last season.

It stated that every team gave its full support in providing the required information and “acted at all times in a spirit of good faith and co-operation throughout the process”.

Heading into last weekend’s Mexico Grand Prix, it was already known that Aston Martin had committed a procedural breach and it was though that another team had potentially done the same.

But the Silverstone-based squad has since been confirmed as the only team to have done so, while still meeting the cost cap level.

Lance Stroll, Aston Martin Racing

Lance Stroll, Aston Martin Racing

Photo by: Zak Mauger / LAT Images via Getty Images

The FIA said that it “was of a very minor nature, originated by unpredictable circumstances outside the control of the F1 team. AMR and FIA have entered an ABA (Accepted Breach Agreement) on 29 September 2025 to resolve the matter.”

The statement from the F1 governing body added: “​​No financial penalties were levied to AMR due to these exceptional and unpredictable circumstances. The Cost Cap Administration confirm that there is no accusation or evidence that AMR has sought or obtained any undue advantage as a result of the breach.”

An ABA, as per Article 6.28 of F1’s financial regulations, is a mechanism whereby the FIA suggests a penalty which is then accepted by the team in question. The statement confirmed that Aston Martin had accepted the offer.

Its breach comes down to the fact that teams are required to hand over documentation to show they have complied with the cost cap by 31 March the following year.

Motorsport.com understands that Aston Martin had prepared its documentation in time, but its auditor was unable to provide a crucial signature due to extenuating circumstances beyond its control, leading to the March deadline being missed.

The last parties to commit a procedural breach were Renault and Honda in 2023, which both settled for an ABA as part of the power unit cost cap filings. But for 2024, all of F1’s power unit suppliers - Mercedes, Ferrari, Honda, Renault and Audi - were found to be in compliance. 

There has only been one previous occasion in which an F1 team has failed to meet the cost cap altogether and that was Red Bull in 2021, as it overspent by 5%. Red Bull was therefore fined $7m and received a 10% reduction in wind tunnel and CFD testing.

Read Also:
Previous article The moment Helmut Marko "started believing" Max Verstappen's F1 title chances
Next article Aston Martin names US driver Jak Crawford as 2026 F1 reserve

Top Comments

Latest news